Company history


An overview of the innovations of recent years

  • share
    content
add to travel guide

2016      Optimierung Beschneiungsanlage

2015     Beleuchtung Variante, teilw. Verbreiterung der Talabfahrt,        Bagjump

2014

2013

2012

construction of the ski route

2010

construction of the Tirol bike park

2009

Expansion of the snow-making plant

"Manni Pranger" 46 degree (= 102%) world championship run

Construction of a tobogganing subway

2008

Construction of the High Tower slope

2007

Construction of the 8th gondola lift feeder to the Bergeralm

2006

Construction of a tobogganing subway

2005

Construction of the “Bärenbachl Water and Adventure World" – constantly being expanded

Inauguration of the “Bärenfalle Restaurant" with sun and lake terraces

2004

Construction of the snow-making reservoir and installation of the snow-making plant – constantly being expanded

Construction of the 4th "Steinboden" chairlift

Construction of the "Bergeralm high-altitude cross-country course arena"

Expansion of the night skiing and night tobogganing

2002

Inauguration of the “Hennensteige” Après-ski bar

Inauguration of the “Bergeralm Panorama Schirmbar"

Inauguration of "Bergeralm Panorama Restaurant"

1999

Construction of the 2nd "High Tower" chair lift

1996

Construction of the 4th gondola lift - capacity:
1,400 P/h (replaced in 2007 with 8-seater)